Educational Group Name: Industrial Engineering
Status: Active
Room Number:
Email:
Phone: 02151212091

Journal Articles

Conferences Articles

Thesis

  • Cross-dock system planning with considering reverse logistics and outsourcing operations under uncertainty conditions
  • 1401/02/05 Seyed Meysam Mousavi (استاد راهنما 1)
  • Fuzzy programming approach for designing resilient and sustainable electricity supply chains under uncertainty conditions
  • 1400/11/13 Seyed Meysam Mousavi (استاد راهنما 1)
  • A Fuzzy Optimization Approch to Respond to Secondary Risks in the Project and to Consider Risks Interdependency
  • 1400/11/03 Seyed Meysam Mousavi (استاد راهنما 1)
  • Green project scheduling with considering the split and multi-mode of activities under uncertainty
  • 1400/11/03 Seyed Meysam Mousavi (استاد راهنما 1)
  • Integrated modeling of project scheduling and material ordering in a multi-site environment considering resource transfer time under uncertainty conditions
  • 1400/11/03 Seyed Meysam Mousavi (استاد راهنما 1)
  • A Fuzzy Project Critical Chain Programming Model Considering Buffer Sizing and Activities’ Crashing
  • 1400/10/29 Seyed Meysam Mousavi (استاد راهنما 1)
  • A fuzzy optimization approach for temporary blood supply chain network design considering queueing theory
  • 1400/10/29 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1400/10/07 Seyed Meysam Mousavi (استاد راهنما 1)

  • Mathematical Modeling for Sustainable Multi-Period Project Portfolio Selection Under Fuzzy Conditions
  • 1400/06/17 Seyed Meysam Mousavi (استاد راهنما 1)
  • Modeling perishable inventory routing problem by considering driver consistency and customer satisfaction under uncertainty conditions
  • 1400/06/16 Seyed Meysam Mousavi (استاد راهنما 1)
  • Project scheduling and controling with the critical chain under fuzzy uncertainty
  • 1400/02/15 Seyed Meysam Mousavi (استاد راهنما 1)
  • Reverse logistics operations planning via cross-docking system
  • 1399/12/25 Seyed Meysam Mousavi (استاد راهنما 1)
  • A two-stage approach for solving resource-constrained project scheduling problem under fuzzy uncertainy
  • 1399/12/25 Seyed Meysam Mousavi (استاد راهنما 1)
  • A fuzzy optimization approach for integrated planning of material procurement and project activities by considering supplier selection and discount schemes
  • 1399/11/14 Seyed Meysam Mousavi (استاد راهنما 1)
  • A multi-level approach to evaluating project contractors based on data envelopment analysis under conditions of uncertainty
  • 1399/11/14 Seyed Meysam Mousavi (استاد راهنما 1)
  • Modeling the problem of project risk response planning in a fuzzy environment
  • 1399/11/13 Seyed Meysam Mousavi (استاد راهنما 1)
  • Modeling supplier selection and order allocation problem and solving it using an extended goal programming method under fuzzy uncertainty
  • 1399/11/13 Seyed Meysam Mousavi (استاد راهنما 1)
  • Mathematical modeling of critical chain project problem by considering buffer sizing and resource constraints
  • 1399/11/12 Seyed Meysam Mousavi (استاد راهنما 1)
  • A quantitative approach to measuring project progress by considering time, cost, and quality under uncertainty
  • 1399/06/11 Seyed Meysam Mousavi (استاد راهنما 1)
  • تحليل جريان نقدينگي در محيط چند پروژه اي با استفاده از زنجيره بحراني
  • 1398/10/17 Seyed Meysam Mousavi (استاد راهنما 1)
  • Modeling of crossdock truck scheduling problem w ith flexible multiple doors
  • 1398/06/12 Seyed Meysam Mousavi (استاد راهنما 1)
  • A new approach to project control based on earned value analysis under uncertain conditions
  • 1398/04/25 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1397/11/14 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1397/11/14 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1397/11/14 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1397/06/25 Seyed Meysam Mousavi (استاد راهنما 1)
  • Developing an approach for project time control by considering risk and earned duration under uncertain conditions
  • 1397/06/10 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1397/04/23 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1397/03/23 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1396/11/17 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1396/11/17 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1396/06/22 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1396/06/08 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1396/06/08 Seyed Meysam Mousavi (استاد راهنما 1)
  • مدل يکپارچه مبتني بر تصميم گيري چند معياره با در نظر گرفتن اثرات اقدامات اصلاحي بر اولويت بندي حالات خرابي تحت شرايط عدم قطعيت
  • 1395/11/09 Seyed Meysam Mousavi (استاد راهنما 1)
  • A hybrid optimization approach based on the quality function deployment to assess the performance of green mega construction projects under uncertain conditions
  • 1395/06/15 Seyed Meysam Mousavi (استاد راهنما اول)
  • مدل تحليل کمي ريسک هاي ايمني براي پروژه هاي احداث در محيط فازي ترديدي
  • 1395/06/08 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1394/06/09 Seyed Meysam Mousavi (استاد راهنما 1)
  • 1394/06/09 Seyed Meysam Mousavi (استاد راهنما 1)